MITSUBISHI TRITON DC HDX (4X4) 2.5

Vehicle Specifications
Brand
MITSUBISHI
Type
TRITON DC HDX (4X4) 2.5
Year
2018
Transmission
MT
Engine Capacity (cc)
2477 cc
Fuel
Solar
Odometer
121274 KM
Chassis Number
MMBJNKL30JH016475
Engine Number
4D56UAP8930
Vehicle Documents
Police Number
BK 8972 YU
Color
HITAM
STNK
Available
Validity STNK
30/09/2026
BPKB
READY, Location: MEDAN
Faktur
Tidak Ada
Foto Kopi KTP
N/A
Blanko Invoice
Tidak Ada
Form A
Tidak Ada
SPH
—
KEUR
N/A
Additional Notes
# NOKA KETRIKAN // PEMENANG WAJIB TTD SURAT PERNYATAAN DI JBA WAJIB BERMATERAI // PENULISAN JUMLAH RODA DIBPKB 6 // KENDALA CEK SAMSAT ONLINE //
INFORMATION
  1. There is an additional fee of 1.1% from the formed price.
  2. Participants must check the unit & documents
LOT 2002
LANE C

MITSUBISHI TRITON DC HDX (4X4) 2.5

Starting Price

Rp 138.000.000

ADDITIONAL FEES
Fee Details
Fee Simulation
Biaya Admin !
Rp 3.000.000
JBA service fee, including PPN 11% and BLN 0.6%
PPN !
+1,1%
Vehicle sales tax 1.1% of the formed price
VEHICLE GRADE
  • Engine C
  • Exterior D
  • Interior D
Auction Date: 10/11/2026 14:00 | WIB

Payment Deadline

5 HK, 17/11/2026 18:00 WIB
Need information about the unit? Contact Us
Auction Location
MEDAN - Jalan Gatot Subroto KM7 No.8 (100 M Setelah Lotte Mart), Medan
Maps Auction Location
Vehicle Location
JBA - MEDAN : MEDAN - Jalan Gatot Subroto KM7 No.8 (100 M Setelah Lotte Mart), Medan
Vehicle Specifications
Brand
MITSUBISHI
Type
TRITON DC HDX (4X4) 2.5
Year
2018
Transmission
MT
Engine Capacity (cc)
2477 cc
Fuel
Solar
Odometer
121274 KM
Chassis Number
MMBJNKL30JH016475
Engine Number
4D56UAP8930
Vehicle Documents
Police Number
BK 8972 YU
Color
HITAM
STNK
Available
Validity STNK
30/09/2026
BPKB
READY, Location: MEDAN
Faktur
Tidak Ada
Foto Kopi KTP
N/A
Blanko Invoice
Tidak Ada
Form A
Tidak Ada
SPH
—
KEUR
N/A
Additional Notes
# NOKA KETRIKAN // PEMENANG WAJIB TTD SURAT PERNYATAAN DI JBA WAJIB BERMATERAI // PENULISAN JUMLAH RODA DIBPKB 6 // KENDALA CEK SAMSAT ONLINE //
INFORMATION
  1. There is an additional fee of 1.1% from the formed price.
  2. Participants must check the unit & documents